Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »


Formal OpenStack Submissions/efforts/projects

Development Proposal

This development proposal is accepted and being run by Sampath Priyankara and this page and JIRA item are meant to facilitate collaboration from other interested staff.

SpecificationSpecification for new HA testing project.  This pre-existing specification is being adopted under the Development proposal and Sampath has requested our assistance in review.https://review.openstack.org/#/c/443504/

Tools


Upcoming working sessions


Task List and Current Status

 Based on the discussions 1 and 2 we had in Boston , some of us start to work on following Tasks.

 Todo: Create work items for each item below in the Eris Jira Project which is a dedicated JIRA project that has been created for managing the various work items through their life-cycle.

Define the test scenariosDefine the test scenarios in details. This includes, what to test, how to test and how to evaluate.Sampath PriyankaraWIP

Some of them are here.

WIP for one with more details on tests.

Gautam Divgi (Unlicensed) added more docs which Sundar Krishnamoorthy (Deactivated) had posted on an earlier link. Keeping things in one place for easier reference.

Tool selectionBased on test cases, select the optimal tool set or identify the tools need build from the scratch.

Sampath Priyankara

Gautam Divgi

Yukinori Sagara

@Tushar Patil

Existing tool survey

Yukinori Sagara and @Tushar Patil start the survey with Stepler and Could 99 other OSS solutions listed here.

Gautam Divgi is working with Resiliency Studio. (Make Resiliency Studio public or provide necessary details for other to proceed with tool selection)

Gautam Divgi (Unlicensed) Completed a tools survey

Formal OpenStack Submissions/efforts/projects

Development Proposal

This development proposal is accepted and being run by Sampath Priyankara and this page and JIRA item are meant to facilitate collaboration from other interested staff.

SpecificationSpecification for new HA testing project.  This pre-existing specification is being adopted under the Development proposal and Sampath has requested our assistance in review.https://review.openstack.org/#/c/443504/

Tools


Upcoming working sessions


Task List and Current Status

 Based on the discussions 1 and 2 we had in Boston , some of us start to work on following Tasks.

 Todo: Create work items for each item below in the Eris Jira Project which is a dedicated JIRA project that has been created for managing the various work items through their life-cycle.

Define the test scenariosDefine the test scenarios in details. This includes, what to test, how to test and how to evaluate.Sampath PriyankaraWIP

Some of them are here.

WIP for one with more details on tests.

Gautam Divgi (Unlicensed) added more docs which Sundar Krishnamoorthy (Deactivated) had posted on an earlier link. Keeping things in one place for easier reference.

Tool selectionBased on test cases, select the optimal tool set or identify the tools need build from the scratch.

Sampath Priyankara

Gautam Divgi

Yukinori Sagara

@Tushar Patil

Existing tool survey

Yukinori Sagara and @Tushar Patil start the survey with Stepler and Could 99 other OSS solutions listed here.

Gautam Divgi is working with Resiliency Studio. (Make Resiliency Studio public or provide necessary details for other to proceed with tool selection)

Gautam Divgi (Unlicensed) Completed a tools survey

  • No labels